Bibframe Work
1. Saturn-V launch ("in clear") (1:36)
2. A-13 countdown (from T-1:00) and launch (thru T+1:00) : includes air-to-ground (3:41)
3. Second stage (SII) early cut-off sequence (0:39)
4. TLI (trans-lunar-injection) burn (0:56)
5. Docking with LM (during TV transmission) (0:47)
6. Extracting the LM from the SIVB (3d stage) rocket stage (0:21)
7. Astronauts give ground go-ahead to maneuver SIVB (which ultimately was guided to a lunar impact) (0:30)
8. Audio from TV transmission as Lovell and Haise enter, and inspect the LM (3:40)
9. More TV audio as Lovell demonstrates their on-board "entertainment" tape recorder (music) (3:34)
10. Trouble sequence
beginning with "We have a problem..." (8:33)
11. Air-to-ground and mission control commentary discuss alternate missions, use of LM as "lifeboat" (3:00)
12. Astronauts inquire about the return time prior to firing the LM descent engine for the first time
to put them back on a "free
return" trajectory (0:55)
13. 1st burn of the LM descent engine
putting astronauts back onto free-return trajectory to earth (1:00)
14. 2d burn of LM engine (on way back to earth) to refine course (1:34)
15. Prior to re-entry, jettison of service module, including observations of crew ("one whole side missing..." (2:12)
16. Prior to re-entry, astronauts are instructed to "power up" the command module (0:17)
17. Prior to re-entry, the LM is jettisoned ("...farewell Aquarius...") (1:14)
18. Re-entry and splashdown (3:03).
Generation Process: DLC marc2bibframe2 v2.5.0
Status: changed
Encoding Level: full not examined
Description Conventions: Anglo-American cataloguing rules
Identified By: bf:Local, 12348570
Change Date: 2003-05-28T11:09:05
Creation Date: 2001-03-15
Description Modifier: United States, Library of Congress
Non-rendered Predicates: lclocal:d906 bf:assigner lclocal:d925 lclocal:d955 lclocal:d985