The Library of Congress > Linked Data Service > BIBFRAME Works

Bibframe Work

Title
Embankment quality phase IV
Type
Text
Monograph
Subject
Embankments--Iowa--Design and construction--Quality control (LCSH)
Roads--Iowa--Embankments--Quality control (LCSH)
Soils--Testing (LCSH)
Quality control (TRT)
Earthwork (TRT)
Soil test (TRT)
Language
English
Illustrative Content
Illustrations
Charts
Geographic Coverage
Classification
LCC: TE210.8 .W493 2007 (Assigner: dlc) (Status: used by assigner)
DDC: 625.7/32 full (Assigner: dlc)(Source: 22)
Supplementary Content
bibliography
Content
text
Summary
The Quality Management Earthwork (QM-E) special provision was implemented on a pilot project to evaluate quality control (QC) and quality assurance (QA) testing in predominately unsuitable soils. Control limits implemented on this pilot project included the following: 95% relative compaction, moisture content not exceeding +/- 2% of optimum moisture content, soil strength not exceeding a dynamic cone penetrometer (DCP) index of 70 mm/blow, vertical uniformity not exceeding a variation in DCP index of 40 mm/blow, and lift thickness not exceeding depth determined through construction of control strips. Four-point moving averages were used to allow for some variability in the measured parameter values. Management of the QC/QA data proved to be one of the most challenging aspects of the pilot project. Implementing use of the G-RAD data collection system has considerable potential to reduce the time required to develop and maintain QC/QA records for projects using the QM-E special provision. In many cases, results of a single Proctor test were used to establish control limits that were used for several months without retesting. While the data collected for the pilot project indicated that the DCP index control limits could be set more tightly, there is not enough evidence to support making a change. In situ borings, sampling, and testing in natural unsuitable cut material and compacted fill material revealed that the compacted fill had similar strength characteristics to that of the natural cut material after less than three months from the start of construction.
Authorized Access Point
White, David J. Embankment quality phase IV